महाराष्ट्र अभियंता सेवा (विद्युत) मुख्य परीक्षा २०१९ पेपर २

महाराष्ट्र अभियंता सेवा (विद्युत) मुख्य परीक्षा २०१९ पेपर २ Questions And Answers:

आपल्या मित्रांना पाठवा :
MahaNMK PRO · लाइव्ह परीक्षा

हीच प्रश्नपत्रिका लाइव्ह परीक्षा म्हणून द्या Experience this paper as a live exam

  • दर वेळी नवीन क्रम — questions shuffled every attempt, so you test yourself, not your memory
  • खरा काउंटडाउन — a server-side timer, auto-submit at 00:00, just like the exam hall
  • लगेच निकाल — score, percentile and answer-wise review the moment you submit
Live Exam PRO सदस्यांसाठी अमर्यादित · Unlimited for PRO members
61.
Bias setting of transformer differential relay cannot avoid maloperation due to
a. external fault
b. CT saturation
c. CT mismatching
d. over-voltage on source side of the transformer
Answer options :

62.
Mho relay is normally used for protection of

63.
The magnetising inrush current in a transformer is rich in

64.
A relay which has no moving parts and performs measurement with solid state circuit is called

65.
For the impedance relaying schemes, calculate the impedance using the

66.
The recommended level of RCCB (Residual Current Circuit Breakers) is ____________ in residences.

67.
The threshold characteristics of a plane impedance relay in complex z-plane is

68.
MCCB stands for ____________ circuit breaker.

69.
In a 3-step distance protection, the reach of the three zones of the relay at the beginning of the first line typically extends into

70.
____________ Relays are best suited for protection of radial feeders.

71.
The inductance of a coil depends on which of the following factors ?

72.
Power quality problems originates from

73.
Voltage distortion limits are specified in

74.
Which event is the short reduction in the RMS voltage between 0·1 to 0·9 pu for a duration of 0·5 cycle to 1 minute ?

75.
Load reduction on power systems causes

76.
In EHV and UHV systems, the type of surge diverter used for overvoltage protection is

77.
The slope of B-H curve at any point is

78.
Instantaneous characteristics of power system electromagnetic phenomena is given by typical duration of

79.
Phase information of UPS is of no use during

80.
The Total Demand Distortion (TDD) is expressed in terms of
आकृती

अधिक प्रश्न पुढील पेजवर:

महाराष्ट्र अभियंता सेवा (विद्युत) मुख्य परीक्षा २०१९ पेपर २ Question And Answers

आता मिळवा सर्व जाहिराती Telegram Channel वर (अगदी मोफत) - येथे क्लिक करा

Maha NMK Here You will get the list of all district from Maharashtra. You Can Select Any Disctrict From The List And Get Latest Recruitment News For The District. Keep Visiting MahaNMK Daily For The Latest Recruitment new and Free Job Alert

Whatsapp Group

© Maha NMK® | Copyright 2015 - 2026 All Rights Reserved.

Made with ❤ in India.