महाराष्ट्र अभियंता सेवा (स्थापत्य) मुख्य परीक्षा २०२० पेपर २

महाराष्ट्र अभियंता सेवा (स्थापत्य) मुख्य परीक्षा २०२० पेपर २ Questions And Answers:

आपल्या मित्रांना पाठवा :
MahaNMK PRO · लाइव्ह परीक्षा

हीच प्रश्नपत्रिका लाइव्ह परीक्षा म्हणून द्या Experience this paper as a live exam

  • दर वेळी नवीन क्रम — questions shuffled every attempt, so you test yourself, not your memory
  • खरा काउंटडाउन — a server-side timer, auto-submit at 00:00, just like the exam hall
  • लगेच निकाल — score, percentile and answer-wise review the moment you submit
Live Exam PRO सदस्यांसाठी अमर्यादित · Unlimited for PRO members
81.
In surface water treatment, correct sequence of unit operation is
(i) Clariflocculation
(ii) Aeration
(iii) Filtration
(iv) Disinfection
Answer options:

82.
While taking levels from a fixed station if staff is shifted at 5 points, then 'change points' are ________.

83.
A level instrument at a height of 1·320 m has been placed at a station having a RL of 115·385 m. The instrument reads – 2·835 on levelling staff held at the bottom of bridge deck. The RL of the bottom of the bridge deck is ________ m.

84.
A reverse curve consists of ________.

85.
Gale's method of traversing consists of plotting the points by:

86.
The correction for sag is ________.

87.
Match List I with List II:

List I
A. Vertical cliff
B. Steep slope
C. Hill
D. Overhanging cliff

List II
I. Contour lines unite at one place to form a single line
II. Contour lines of different elevations cross one another
III. Contour lines are closely spaced
IV. Closed contour lines with higher values inside

88.
The shape of vertical curve is :

89.
If the WCB of a line is 170° 40′, the quadrantal bearing is

90.
The following are the instrumental methods used for setting out horizontal circular curve.
(i) Rankine's method of tangential angle
(ii) Two theodolite method
(iii) Tacheometric method
The sequence of these methods from the least accurate to the most accurate is

91.
The purpose of making a hydrographic survey is :

92.
Anushka's father, for her marriage, published in a marriage magazine, "To marry with my daughter, the candidate must have been placed through MPSC Examinations". It's an example of ________.

93.
Same type of work under different conditions and nature shall be measured :

94.
Pick up the measurement which is not made in square meters for payment.

95.
The quantity of stone grit required for tar and bitumen road should be measured in :

96.
If a large piece of land is required to be divided into plots after providing roads, parks, etc., which method of valuation is suitable ?

97.
Revised Estimate is prepared when the :

98.
Which document does not contain engineering contract documents ?

99.
Which are the main sources from which information regarding specifications of civil engineering works can be obtained ?

100.
Coefficient of annual sinking fund (Ic) can be determined by

अधिक प्रश्न पुढील पेजवर:

महाराष्ट्र अभियंता सेवा (स्थापत्य) मुख्य परीक्षा २०२० पेपर २ Question And Answers

आता मिळवा सर्व जाहिराती Telegram Channel वर (अगदी मोफत) - येथे क्लिक करा

Maha NMK Here You will get the list of all district from Maharashtra. You Can Select Any Disctrict From The List And Get Latest Recruitment News For The District. Keep Visiting MahaNMK Daily For The Latest Recruitment new and Free Job Alert

Whatsapp Group

© Maha NMK® | Copyright 2015 - 2026 All Rights Reserved.

Made with ❤ in India.