महाराष्ट्र अभियंता सेवा (स्थापत्य) मुख्य परीक्षा २०१९ पेपर १

महाराष्ट्र अभियंता सेवा (स्थापत्य) मुख्य परीक्षा २०१९ पेपर १ Questions And Answers:

आपल्या मित्रांना पाठवा :
MahaNMK PRO · लाइव्ह परीक्षा

हीच प्रश्नपत्रिका लाइव्ह परीक्षा म्हणून द्या Experience this paper as a live exam

  • दर वेळी नवीन क्रम — questions shuffled every attempt, so you test yourself, not your memory
  • खरा काउंटडाउन — a server-side timer, auto-submit at 00:00, just like the exam hall
  • लगेच निकाल — score, percentile and answer-wise review the moment you submit
Live Exam PRO सदस्यांसाठी अमर्यादित · Unlimited for PRO members
61.
What is the effective span of staircase supported at each end by edge of the landing slab, which spans parallel, with the risers, if width of both landings is 2.5 m and going of stair is 2.2 m (see fig.) :

आकृती

62.
In the design of retaining wall, both, active earth pressure and passive earth pressure is considered due to soil available on both sides (with different heights) of R.C.C. retaining wall. If angle of repose, φ = 30°, then what will be the relation between coefficient of active earth pressure (Ka) and passive earth pressure (Kp) ?

63.
What is the effective span of staircase, supported at each end by landing spanning parallel with the risers, if the width of landing is 2.5 m, width of starting passage is 1.5 m and going of the stair is 2.2 m ?

64.
The minimum area of tension reinforcement shall be not less than ______ for design of beam.

65.
For high yield strength deformed bars of grade Fe 500, the permissible stress in direct tension and flexure tension shall be ______ used in working stress method.

66.
If, in any given plane, one end of the column is unrestrained, its unsupported length 'l' shall not exceed ______. Where 'b' is width and 'D' is depth of cross section in plane under consideration.

67.
If top of earth retained is horizontal, the coefficient of passive earth pressure for retaining wall become :

68.
A concrete beam is post-tensioned by a cable carrying an initial stress of 1000 N/mm², the slip at jacking end was observed to be 5 mm, modulus of steel is 210 kN/mm² and span of beam is 30 m; what is % of loss of stress due to anchorage ?

69.
The rate of increase of stress is large in case of :

70.
A simply supported prestressed concrete beam of span 10 m is subjected to a point load of 10 kN at centre. Prestressing force of 2000 kN is applied through inclined tendon, zero eccentricity at support and 'e' at mid-span. To nullify the external point load effect, how much 'e' should be provided ? Neglect the self weight of beam.

71.
In a prestressed concrete beam, the ratio of applied prestressing force (P) to the concrete capacity of the section in compression is known as

72.
✖ रद्द प्रश्न · Cancelled The minimum transverse reinforcement in prestressed concrete beam is given by formula :

73.
The net downward force of pre-stressed concrete beam with bent tendon is given as :

74.
High tensile bars threaded at the ends are used in :

75.
A post tensioned concrete beam is prestressed by means of three cables each 100 mm² area and stressed to 1100 MPa. All three cables are straight and located at an eccentricity of 50 mm. If modular ratio (m) = 6 and stress in concrete at the level of steel (fc) = 5 MPa, then what is the loss of stress in cables due to elastic shortening if all cables are simultaneously tensioning and anchoring ?

76.
At the time of initial tensioning, the maximum tensile stress fpi immediately behind the anchorage shall not exceed ______ of the ultimate tensile strength fpu of the wire or bar or strand.

77.
A system usually adopted in the production of pre-tensioned members like railway sleepers, poles, etc on large scale is ______.

78.
On the areas immediately behind external anchorages, the permissible unit bearing stress on the concrete, after accounting for losses due to relaxation of steel, elastic shortening and seating of anchorages, shall not exceed ______.

79.
Independent float of an activity (i, j) is denoted by IF (i, j). The earliest occurrence times of i and j are denoted by Ei and Ej respectively. The latest occurrence times of i and j are denoted by Li and Lj respectively. D(i, j) indicates the duration of the activity. Select correct option giving IF (i, j) :

80.
A part of quality management system, that indicates the degree to which design quality is achieved in the actual construction work is called :

अधिक प्रश्न पुढील पेजवर:

महाराष्ट्र अभियंता सेवा (स्थापत्य) मुख्य परीक्षा २०१९ पेपर १ Question And Answers

आता मिळवा सर्व जाहिराती Telegram Channel वर (अगदी मोफत) - येथे क्लिक करा

Maha NMK Here You will get the list of all district from Maharashtra. You Can Select Any Disctrict From The List And Get Latest Recruitment News For The District. Keep Visiting MahaNMK Daily For The Latest Recruitment new and Free Job Alert

Whatsapp Group

© Maha NMK® | Copyright 2015 - 2026 All Rights Reserved.

Made with ❤ in India.